soldering steel tubes to brass

Objective
Soldering of stainless steel tubes to brass base

Equipment
SM-5/200
HS-8

Materials
Customer material
including flux

Key Parameters
Power: 2 kW
Temperature: 482°F (250°C not measured)
Time: 14 -16 sec

Process Steps

Customer process instruction has been followed
SM-5/200 system was limited to 2kW

Results and Conclusions

  1. Sample position according to the coil is vital. Stainless steel is heated much fasted than the brass. So, the coil is positioned over the brass part (around 95%)
  2. Recommended UFC equipment for this application:
    SM-2/200 – induction generator
    – HS-4W – heat station
    – WCA – 1000-02 – cooler

Pictures

Videos

Request information or contact us about this application. Reference info: Application Note 3464-5341