UltraFlex Start-Up Assistance

Talk to your UltraFlex salesperson about current rates.

Prior to start-up, the Customer is responsible for positioning the equipment in its intended location.

The Customer will also provide a sufficient raw or distilled cooling water supply (dependent upon the cooling system specified), adequate electrical power in accordance with the proposed system specifications, and complete all interconnecting wiring and plumbing of the installation.